It is done ! The saltwater basin that had formed when the caissons belt was closed is now filled.
The 750,000 tonnes of quarry sand required, were deposited and spread over 2 months over the entire surface (6 hectares).
We use cookies to store information to provide the best possible experience.
By continuing to browse you are accepting our Privacy & Cookie Policy